Featured project
36-inch gas pipeline
Clearing, ridging and stringing of a 36-inch gas pipeline right of way, under a subcontract awarded by Zakhem. Our crews ran excavators and the CAT D8N side boom to clear the route and string pipe joints ready for welding.
- Main contractor
- Zakhem
- Pipe size
- 36 inch
- Scope
- Clearing, ridging, stringing
- Location
- [Project location]
